Tags

, ,

by M K Nance

© Ami Volz

© Ami Volz

MAIN CHART

MAIN CHART

SET UP - BOTTOM CHART

SET UP – BOTTOM CHART

POST HERE

PATTERN HERE

The shawl is worked from the top down.

To change the finished dimensions of the shawl, add or subtract groups of 14 stitches from the cast on number, to increase or decrease the number of repeats. Each repeat adds 3 1/2 inches to the top edge, and 9 inches to the bottom edge.

CDD: Slip 2 sts together (as if to k2tog), k1, then pass 2 slipped stitches over.

Charts
The charts for this pattern are very large. Each fits on a letter-sized page.
Click below and print each resulting page.

Setup + bottom charts | main chart

DIRECTIONS

Cast on 105 sts.

Work to Rows 1-10 of Setup Chart. 147 sts when chart is complete.Work Rows 11-65 of Main Chart. 273 sts when chart is complete.

Work Rows 66-73 of Bottom Chart twice, or to desired length.

Knit 2 rows.

Bind off loosely.

FINISHING
Weave in ends and block to desired measurements.

Advertisements